Framers first. Electricians second. Inspectors last. Automated.
Multi-trade coordination is the hardest operational problem in construction. One trade out of sequence cascades into $10K+ of delays, rework, and penalties. Service Points enforces your activity dependencies automatically — so jobs run on sequence, not on luck.
Why multi-trade coordination destroys construction margins
Most SMB general contractors manage multi-trade coordination with group texts, spreadsheets, and constant phone calls. One wrong move costs $10K+.
The wrong trade shows up first
Electricians show up before framing is complete. They wait on your dime, or worse — start work in the wrong sequence. You pay for rework and a delayed inspection.
Inspection windows missed
Missing an inspection window sets a job back 2-5 days. Without automated inspection triggers, requests get forgotten, delayed, or filed late — cascading into everything downstream.
Subcontractor coordination chaos
5 subcontractors across 3 active sites — each with different timelines — requires a full-time coordinator that most SMB contractors simply don't have.
🏗️
Trade dependency enforcement
Frame → electrical → plumbing → drywall → inspection → finish. Each trade locked behind its predecessor — automatically, without a coordinator.
📅
Inspection scheduling automation
When rough-in is marked complete, Service Points automatically triggers the inspection request and schedules the inspector — before you even think to ask.
👷
Subcontractor dispatch & tracking
All subcontractors receive automatic notifications when their window opens. You see real-time status across every trade on every active site from one dashboard.
📋
Permit & compliance tracking
Building permits, inspection records, and subcontractor documentation all captured automatically as part of the workflow.
Free tool
Work Order Capacity Calculator
How many jobs can your team actually handle? Calculate your real capacity — and how much revenue you're leaving on the table through coordination inefficiency.
Construction Work Order Capacity
Calculate your real throughput and revenue potential
Monthly revenue capacity
—
Calculating...
Jobs per month (current)
—
Jobs per month (with SP)
—
Coordination hrs saved/month
—
Additional revenue unlocked
—
Enter your numbers above to see your capacity analysis.
What coordination inefficiency actually costs you
The hidden coordinator cost
At 2.5 hours/job/day of coordination overhead across 4 active jobs = 10 hours/day of pure admin. That's a full-time employee producing zero billable work.
The capacity ceiling
Most SMB general contractors hit a capacity ceiling not because they lack skilled workers, but because their coordination overhead limits how many jobs they can run simultaneously.
Service Points impact on construction
Coordination time reduced by70%
Inspection delays prevented~90%
Wrong-trade dispatches eliminated100%
Additional jobs per month+1 to +2
Ready to eliminate sequencing errors?
Book a 20-minute demo. We'll map your specific trade workflow and show you exactly how Service Points enforces your sequence.